ES | CN
+86 025 8665 1110
Home >> News

After the construction of the reinforced glue, how long does it take to cure before it can be pulled?

Sep. 19, 2018


Many customers ask for the curing time of the reinforced glue after planting the steel bars or screws, because they want to do the pull test, but do you know the curing time of the reinforced glue has a direct relationship with the temperature? The higher the temperature is, and the faster the curing is. The lower the temperature is, and the slower the curing is. The picture below is the curing time of Mankate’s reinforced adhesive. You can compare it with others.


1.jpg

 

Generally, the planting-bar glue has a summer formula and a winter formula. When used, the winter formula glue should not be used in the summer, because the summer temperature is too high for the winter formula glue, and the curing is fast. The summer glue is not used in the winter. The curing is slow and the glue becomes very thick and difficult to stir. Of course, the performance index of the reinforced glue is also very important, and it is required to meet the technical requirements of the A-grade glue of the GB50367-2013 standard. You can refer to the following picture:


2.jpg


What are the application areas of reinforced glue?


1. column steel bar implantation: column extension, structural column extension, shear wall dark column, column enlarged cross-sectional area reinforcement.


2, the reinforcement of the hole to fill: floor connection or hole, wall connection or hole, construction hole, equipment or pipe hole, stair hole.


3. new wall reinforcement: shear wall reinforcement, filled wall pull reinforcement, underground continuous wall connection, retaining wall connection, pool wall.


4. newly added sloping steel bars: step ladders, spiral staircases, underground ramps, warehouse boards.

 

5, cantilever structure steel: cantilever beam, cantilever board, balcony, stair walkway platform.


6, the steel connection of the newly added structure: structural beam, structural board, structural basis.


7. structure connection of tunnel engineering: underground continuous wall, culvert, tunnel.


8. reinforcement and reconstruction of bridges and roads: reinforcement of railway bridges, highway bridges, highways and runways.


Editor: Nanjing Mankate, if you need to reprint, please indicate the source!

Original link: https://www.njmkt.net/Article/zjjsghxydz.html