The project of Shanghehang Changjiang Road elevated and underground Integrated pipeline needs not only good products.
In order to ease the needs of cross-river transportation, Changjiang Road was reconstructed, which an elevated system was added. And it was connected with the Shanghehang Wuhu Yangtze River Bridge's Jiangnan Line to improve the traffic network. The construction of the underground comprehensive pipeline project on the Changjiang Road was started. The project is divided into three parts: Jiangnan Wiring, Changjiang Road overhead, and Jiangbei Wiring. The total investment of this project is 3.848 billion. As a key construction project in Wuhu, China Railway Bridge Bureau naturally took great care when purchasing various materials.
China Railway Bridge Bureau purchased Nanjing Mankate embedded channel once again.
Nanjing Mankate is a company with 15 years of experience in the production of the embedded channels. The underground integrated pipeline project requires the use of embedded channels. China Railway Bridge Bureau didn't hesitate to purchase Nanjing Mankate's embedded channels once again. Nanjing Mankate embedded channel is a high-preservation one, whose salt spray time can be up to 3000 hours! Good quality and materials, processing technology, intimate pre-sale and after-sales service, all of these advantages have made Nanjing Mankate embedded channel approved by China Railway Bridge Bureau for many times!
Free hotline: 400-894-5118
Editor: Nanjing Mankate
Copyright belongs to www.njmkt.net. For reprint, please indicate the source.